SECTOR: Renewables

Harland and Wolff, working for E.ON (foundations) and Vestas (topsides), were responsible for the storage, assembly and offloading onto delivery jack-ups. Materials included monopiles, transition pieces, towers, hubs, nacelles, blades, grout, infield and export cables and miscellaneous outfit.

  • Services: Repair & Maintenance / Fabrication & Construction
  • Client: Vestas Offshore A/S
    E.ON Climate & Renewables UK
  • Project: Robin Rigg Offshore Wind Farm Logistics and Assembly
  • Date Commenced: Qtr 2 2008
  • Date Delivered: Qtr 3 2009
robin rigg

By utilising the twin gantry cranes, dockside and mobile cranes, transporters and 80 acres of hard standing ground, H&W were able to accommodate all 60 sets on site with ease. Throughout the duration H&W supported the project with additional services such as provision of heavy engineering trades, dry-docking, repair and modifications to the delivery and installation vessels and steel fabrication / construction.

In line with the exacting performance standards demanded of E.ON / Vestas, H&W implemented a step change in its Health and Safety methods and procedures, driving to attain ‘best-in-class’ status. This resulted in applying a highly visible and rigorous system which is now our standard.

robin rigg
robin rigg

Related Projects

Scotrenewables SR2000 Tidal Turbine

RENEWABLES
  • Technical Services
  • Fabrication & Construction

Scotrenewables launch world’s largest tidal turbine.

Humber Gateway MSF & Jacket

RENEWABLES
  • Technical Services
  • Fabrication & Construction

Design and fabrication of a Module Support Frame (MSF) and substation Jacket for E.ON for installation in the Humber Gateway Offshore Windfarm.

Bard 1 Transformer Platform and Jacket

RENEWABLES
  • Fabrication & Construction

H&W completed the construction of an offshore wind energy transformer in a joint project.